The annual cargo handling capacity of Dalian port is 112 million tons, the
container handling capacity is 1.35 million TEU.
The passenger volume of
Dalian airport is 3.335 million person-time, the cargo and mail handling
capacity is 93,000 tons, and it has opened over 80 air routes??among them 14 are
international routes, including Dalian to Japan, Korea, Russia and Hong
Kong.
The total cargoes import and export through Dalian port values at
US$20.6 billion, among them import values at US$9.15 billion and export values
at US$11.45 billion.
The total road mileage is 4451 kilometers, and the
average density is 36.4km/100km2. The Dalian's expressway which has linked
Shenyang, Beijing, Changchun and Harbin has the mileage of 244
kilometers.
There are totally 600 million Cubic meters of water reserve
in the over a dozen of reservoirs dispersed across Biliu River and Yingna River.
The daily water supply capacity is 1.3 million tons with 900 thousand tons of
water being actually utilized. With the increasing demand for the future
development of the city, Dalian will divert water from Dayang River and Yalu
River.
Sufficient supply of power and gas can meet the requirements of
economic development.
[Urban Infrastructure
Construction Projects]
|
Focusing on the 10 infrastructure projects, Dalian carried out
80 key urban construction projects in 2002, with the total investment of
8.84 billion Yuan. The 46.6 kilometers Light Rail from Xiang Lujiao to the
Golden Pebble Beach has opened to traffic.
The second phase
project of the trial tram rail from Dalian Maritime University to Heko
started its trial run ahead of schedule. In the renovation and extension
project of Dalian Railway Station, the renovation of the south square and
the south wing has completed and the construction of the elevated waiting
lounge and the north wing has almost been finished.
In the
extension of Zhou Shuizi airport, 70 thousand square meters parking apron
and 30 thousand square meters parking lot were newly built, and the new
terminal building has started construction. The reservoir dam of the
Yingna River has been built to 78 meters high and has started reserving
water. In the renovation of the Tianjin Street, the infrastructure
constructions such as upgrading all underground pipelines have been
completed.
The underground construction of the Commercial City on
XiˇŻan Road has finished. The second phase project of Dayao Bay container
terminal, 250 thousand tons ore port, 300 thousand tons crude oil port and
the second phase project of the Convention and Exhibition Center have
started construction.
Dalian invested 1.04 billion Yuan in road
building and 9 road projects have been finished including the renovation
of the Heida Road, the construction of 7 overpasses open onto each other
on the Dazhuang Road and the second phase project of the HaiPi Road. 34
kilometers road has been surfaced, with the black pavement rate of 63.2%,
a rise of 6.7%, ranking the top among the cities of the province. 14
projects for the benefit of the citizens have been done such as widening
and renovating the west sector of the Huanghe Road, the east sector of the
Changchun Road, the Nansha Street and the Jiaobei Road, etc. 65 roads and
streets have been maintained, with a total area of 1.2 million square
meters, and 94.04% were in good condition. 5765 road lamps have been newly
installed, and the lighting rate has reached 99%.
|
| |
 |
 |
|
| [Public
undertakings] |
| In 2002, 18.7 kilometers gas pipelines were
renovated and 29 thousand gas users were added. Meanwhile 22 kilometers
drainage pipelines were renovated and 99.03% drainage facilities were up
to the standard. The coverage rate of urban water supply is
100%. |
| |
 |
| [Afforestation] |
| The area of the public green land
increased by 1.1 million square meters. 3.58 million trees and 10.1
million flowers were planted. Therefore the urban green coverage reached
41.5% and the per capita area of the public green land came to 9.5 square
meters. Four squares, two parks, two urban woodland and 22 green gardens
were newly built. |
 |
|
| [Building
Industry] |
| The added value generated by the qualified
architectural enterprises was 5.6 billion Yuan, increased by 13% than that
of the previous year. Among the 8100 projects under construction, 4341
were contracted by the way of bidding, accounting for 53.6%. 5941 projects
were completed, among which 2147 were fine projects, taking up 36.1%. The
labor productivity of the year calculated according to the output value
was 85205 Yuan per person, up 16.1%. |
|